By Spencer James, HighGround Exchange · Updated · Sources & methods
Lodging is energy-dense, and the load never fully stops
The defensible national measure for lodging is EIA's Commercial Buildings Energy Consumption Survey, and it is blunt about the sector's density: lodging buildings were 7 per cent of US commercial floorspace but 9 per cent of commercial building energy consumption, using 598 trillion Btu in the 2018 survey. The mean site energy intensity for lodging buildings was about 85.7 thousand Btu per square foot, and the fuel split was electricity at 342 trillion Btu against natural gas at 224 trillion Btu. Hotels were 46 per cent of lodging energy consumption, with nursing homes and assisted living at 30 per cent. Within the sector, water heating and space heating were each roughly a fifth of energy use, while lighting, cooling, refrigeration and office equipment each ran at ten per cent or less. The EPA's ENERGY STAR reference table uses a narrower population and puts the median hotel at about 146.7 thousand Btu per square foot of site energy, with a source figure of about 63. The two numbers are not interchangeable: they measure different populations on different energy-accounting bases.
- Lodging: 7 per cent of commercial floorspace, 9 per cent of commercial energy use.
- 598 trillion Btu in the 2018 survey; electricity 342 and natural gas 224.
- Mean lodging site intensity about 85.7 thousand Btu per square foot.
- Water heating and space heating roughly a fifth each.
- Hotels are 46 per cent of lodging energy consumption.
- ENERGY STAR's hotel median is about 146.7 thousand Btu per square foot of site energy.
Guest Wi-Fi is a capacity problem, not a speed problem
There is no authoritative per-guest bandwidth number, so a property has to size from its own building. The engineering convention is to model concurrent active devices rather than registered ones: occupied rooms multiplied by average guest devices per room, multiplied by a simultaneous-use factor, multiplied by the peak throughput assumed per active device. The design ranges hotel network consultants commonly use are two to four guest devices per occupied room, a simultaneous active share of 20 to 40 per cent at peak, and two to five megabits per second per concurrently active device for ordinary browsing and moderate video, rising to five to ten where the property promises high-definition streaming or casting. Those are design assumptions, not published statistics, and they should be stated with the occupancy and concurrency behind them. Backhaul is sized separately from Wi-Fi airtime: a property can have ample internet capacity and still draw complaints when access-point density, uplinks or switching are the real constraint.
- Model concurrent active devices, not registered devices.
- Plan on two to four guest devices per occupied room.
- Assume 20 to 40 per cent of them active at peak.
- Allow two to five megabits per second per active device; five to ten for HD or casting.
- State the occupancy and concurrency behind any design figure.
- Size backhaul separately from coverage and airtime.
The property systems need their own zones
A hotel runs a property management system, payment terminals, door locks, cameras, building controls and the guest network, and the common failure is putting them all on one flat network. The PCI DSS framework's objective is to define and control the cardholder data environment and shrink what can affect it, and the architecture that supports that separates the payment environment from the property-management and front-office zone, from guest high-speed internet access, from staff endpoints, from the operational devices such as locks, thermostats and televisions, and from the management plane. Segmentation is enforced with firewalls or equivalent controls, deny-by-default rules, tightly scoped administrative access and documented data flows. Segmentation can reduce the assessment scope, but it does not by itself make an environment compliant: that depends on the actual card-data flows, the controls in place and the testing performed.
- Keep the payment environment in a zone of its own.
- Separate the PMS and front-office zone from guest high-speed internet.
- Put locks, HVAC controls, TVs and cameras on an operational zone.
- Keep the management plane off the flat network.
- Enforce with deny-by-default rules and documented data flows.
- Segmentation reduces scope; it does not by itself establish PCI DSS compliance.
Reservations and the front desk are revenue plumbing
A reservation call or a check-in that fails is a revenue event rather than an IT ticket, which is why the telephony layer is worth designing for failure rather than for features. The questions that matter are whether the reservation line survives the loss of a single internet circuit, whether the front desk can take a payment when the property management system is unreachable, whether calls can be routed to a second property or a centralised team, and whether the number itself belongs to the business. Number portability is a project with lead time, so ownership and the porting process are worth confirming before committing to a platform change. For a group, one shared platform moves staff between properties and gives a single queue and reporting standard; for a single property the same capability may be more configuration than the building will ever use.
- Treat the reservation line as revenue-critical.
- Confirm telephony survives the loss of one circuit.
- Have a payment path that works when the PMS does not.
- Confirm who owns the number, and how porting works, before switching.
- Routing to a second property or a central team is the group benefit.
- Match the platform to the property count, not to the brochure.
The energy decisions that actually move a hotel bill
Because the load never fully switches off, a hotel's controllable energy sits in a handful of systems. Guest-room heating, ventilation and air-conditioning and lighting are the largest controllable slice, and occupancy-based control is the standard lever where local regulation and guest comfort allow it. Laundry plant, pool and spa heating, and commercial kitchen equipment run on long duty cycles and set the property's demand profile, so they belong in any review of the demand line rather than the consumption line. Benchmarking is how a property sees whether it is out of line with its peers: EPA's ENERGY STAR score runs from 1 to 100, with 50 at the median of the reference population and 75 or above generally the threshold for certification eligibility, and a hotel's score depends on fuel and property-type inputs as much as on total consumption. For a portfolio, contract timing matters as much as the price: stagger expirations so leverage does not expire across every property at once.
- Guest-room HVAC and lighting are the largest controllable slice.
- Occupancy-based control is the standard lever, where regulation and comfort allow.
- Laundry, pool and kitchen plant set the demand profile.
- Review the demand line, not just consumption.
- ENERGY STAR scores run 1 to 100; 50 is the median and 75 the certification threshold.
- Stagger contract expirations across a portfolio.
A PIP bundles the technology and energy refresh
A Property Improvement Plan is a franchisor-issued set of required upgrades that brings a property back into line with current brand standards. The usual triggers are a change of ownership or management, a franchise renewal, conversion to a different brand, a quality review, a major renovation cycle, or a change to brand design, technology or sustainability standards. The scope can reach structured cabling, wireless coverage, in-room entertainment and casting, guestroom controls, access control, lighting and HVAC — which is exactly why a PIP is the moment to align the network, the energy contract and the building systems rather than buy them as three separate projects. Treat a PIP as a brand-compliance mechanism that can trigger a coordinated capital refresh, not as a universal rule: the scope, the deadline, the approved products and the remedy all come from the franchise agreement, the brand standards and the property's own plan.
- PIPs are franchisor-issued brand-compliance requirements.
- Triggers include ownership change, franchise renewal and brand conversion.
- Scope can cover cabling, Wi-Fi, in-room entertainment, controls, lighting and HVAC.
- A PIP is the natural moment to align network and energy decisions.
- Scope, deadline and remedy come from the franchise agreement, not a universal rule.
What a hospitality group should bring to the first conversation
The useful starting point for a hotel or a group is an inventory rather than a request for a price. Bring the property list with addresses and building sizes, the brand standard or PIP each property is working to, and the planned renovation dates, because those dates decide when a technology or energy decision has to be made. Add the current connectivity arrangement per property with its end date and notice period, the count of guest rooms and the occupancy pattern, twelve months of energy usage in the unit each contract is priced in, and the systems that have to keep working during an outage. Availability and terms depend on each address and the utilities that serve it, so no two properties produce the same answer. An inquiry places no order and switches no supplier; it starts a conversation about what is actually available at each property, and HighGround may receive compensation from providers on completed purchases.
- Property list with addresses and building sizes.
- The brand standard or PIP each property is working to, with renovation dates.
- Current connectivity terms per property, with end dates and notice periods.
- Room counts, occupancy pattern and twelve months of energy usage.
- The systems that must survive an outage.
- An inquiry places no order and switches no supplier.
Gas carries about two-fifths of a lodging building's energy
The 2018 CBECS figure splits lodging energy into 342 trillion Btu of electricity and 224 trillion Btu of natural gas, so a hotel's energy decision is really two decisions on two rulebooks. Gas is not a minor line: nationally in 2018 natural gas supplied 67 per cent of commercial water-heating energy, 73 per cent of commercial space-heating energy and 81 per cent of commercial cooking energy. For lodging specifically, water heating and space heating are each about a fifth of end-use energy, and a single boiler plant can sit behind guest showers, housekeeping, the kitchen and the laundry as well as space conditioning. That is why a hotel with a gas boiler plant and a gas kitchen has a different exposure from an all-electric building: a cold snap shows up first on the gas bill, not the electric one, and the two commodities are shopped, contracted and renewed separately.
- Lodging, 2018: 342 trillion Btu of electricity against 224 trillion Btu of natural gas.
- Natural gas supplied 67 per cent of commercial water heating, 73 per cent of space heating and 81 per cent of cooking energy in 2018.
- Water heating and space heating are each about a fifth of lodging end-use energy.
- One boiler plant can serve showers, laundry, the kitchen and space conditioning.
- Electricity and gas are separate contracts with separate terms and renewal dates.
The demand line is a coincidence problem, not a volume problem
A commercial demand charge is set by the highest measured interval in the billing period, so what drives it is not how much energy the building uses but how many things switch on at once. Cooling, ventilation and lighting each account for more than 14 per cent of lodging electricity, and the peaks cluster in predictable windows: morning departure together with breakfast service, laundry and hot-water recovery; afternoon cooling meeting kitchen preparation and pool plant; and evening restaurant service with lighting. A demand review therefore looks for the coincidence rather than the average, because staging the laundry and the hot-water recovery, or holding the pool plant to off-peak hours, can lower the measured peak without changing annual consumption — and it is the measured peak, not the volume, that the demand component prices. The same logic applies to a gas tariff that carries its own demand or ratchet element, where a single high-demand day can set part of the charge.
- The demand charge follows the highest measured interval, not annual use.
- Cooling, ventilation and lighting each exceed 14 per cent of lodging electricity.
- Peak windows: morning departure, breakfast, laundry and hot-water recovery; afternoon cooling and kitchen; evening service.
- Staging laundry and hot-water recovery can lower the measured peak without touching volume.
- A gas tariff can carry its own demand or ratchet element set by one high-demand day.
What a hotel or group usually bundles next
Energy is the first conversation because it is the largest controllable operating cost, but the same property list that drives an energy review also drives the adjacent decisions. Guest connectivity and the reservation line come up together, because both are judged every day and both fail visibly; the segmentation that protects card payments is the same work that separates guest traffic from the property-management system; and connectivity, telephony and the PMS want to be designed as one thing rather than three. For a group the leverage is standardisation: a reference network design, a common telephony platform and a documented set of interfaces let a new or acquired property be assessed against the same baseline instead of rebuilt from scratch. Bundle when a single trigger — a PIP, a franchise renewal, an acquisition or a renovation — is already forcing the decision, and keep every contract's dates on one calendar so the windows do not collide.
- Guest connectivity and the reservation line are judged daily and fail visibly.
- The segmentation that protects card data is the same work that isolates guest traffic.
- Connectivity, telephony and the PMS are best designed as one decision.
- For a group, standardise the reference design, the platform and the interfaces.
- Bundle when one trigger — PIP, acquisition, renovation — already forces the decision.
- Keep every contract's renewal dates on a single calendar.
PUT THE OPTIONS SIDE BY SIDE
Your comparison checklist
| Property situation | Confirm first | What to compare |
|---|---|---|
| Guest complaints about Wi-Fi | Concurrent devices and coverage, not just the circuit | Access-point density, uplinks and a throttling policy |
| New brand or franchise standard (PIP) | What the standard actually requires | Specification and circuits sized to the new requirement |
| Reservation line reliability | Whether telephony survives a circuit failure | Cloud voice or contact centre with failover and numbering |
| Rising energy across occupancy swings | Whether the demand or the consumption line is moving | Supply terms plus HVAC, laundry and kitchen scheduling |
| Energy benchmarking below the peer median | The fuel and property-type inputs to the score | The measures the low score points to, and any tune-up duty |
- A person reads every request and replies within 24 hours.
- Sending an inquiry does not place an order or commit you to anything.
- Availability and terms get confirmed for your locations before anything is decided.
Or call (501) 463-2471
Common questions
Further reading
Provider and official resources for the relevant service categories. Product availability and terms must be confirmed for your request.
U.S. Energy Information Administration — Inside Lodging Buildings (CBECS building analysis) ↗U.S. Energy Information Administration — Commercial Buildings Energy Consumption Survey ↗EPA ENERGY STAR Portfolio Manager — US national median energy use intensity by property type ↗PCI Security Standards Council — PCI DSS ↗NIST — Small Business Information Security: The Fundamentals (SP 7621 Rev. 1) ↗U.S. Energy Information Administration — 2018 CBECS commercial buildings energy consumption survey (end-use detail) ↗EPA ENERGY STAR Portfolio Manager — ENERGY STAR Score technical reference ↗EPA ENERGY STAR — DataTrends: Hotel ↗