HIGHGROUNDEXCHANGE(501) 463-2471Find my solutions

SOLUTIONS FOR YOUR INDUSTRY

Warehouse connectivity, automation and energy

A warehouse is a factory for moving things, and every move is tracked by a device that needs a network. Scanners, tablets, voice-picking headsets, cameras, sensors and dispatch systems all fail together when connectivity does, so uptime matters more than raw bandwidth. On the energy side the building is unusual: it is one of the least intense categories in commercial real estate until refrigeration, charging or automation adds a concentrated load.

Advisor-assisted purchasing. Options and terms depend on your location and requirements.

By Spencer James, HighGround Exchange · Updated · Sources & methods

Coverage is the hard part, not speed

Large buildings full of racking, steel, concrete and dense inventory are hostile to wireless. Signal that works in an empty warehouse degrades once racking and stock are installed, which is why coverage planning has to account for a loaded building rather than a clean floor plan. Bandwidth planning ranges for warehousing and industrial sites commonly run around 200 Mbps to 1 Gbps where many scanners, cameras, sensors and cloud-linked systems are in play, but the practical failure mode is a dead spot at the far end of an aisle rather than an inadequate circuit.

  • Survey with racking and stock in place, not on an empty floor.
  • Plan for handheld coverage in every pick face, not just the office and docks.
  • Mobile equipment and radios interfere; account for them in the design.
  • Segregate IoT and scanners from office and guest traffic.

What logistics devices do to a network

Individual devices are modest — a scanner or handheld is a fraction of a megabit — but a warehouse runs hundreds of them at once, plus cameras at roughly 2 to 5 Mbps each and cloud backups in the 20 Mbps-and-up range. The aggregate, combined with the requirement that no session drop, is what drives specification. Voice-picking systems add a real-time constraint: latency and jitter cause mis-picks, which is a service failure rather than a slow download.

  • Estimate concurrent devices rather than headcount on site.
  • Prioritise voice and scanner traffic above everything non-operational.
  • Roaming between access points must be seamless along travel paths.
  • Plan backup connectivity for dispatch and shipping systems specifically.

Where warehouse energy actually goes

Warehouses look energy-light by floor area and are heavier than they look by consumption. EIA's 2018 Commercial Buildings Energy Consumption Survey puts warehouse and storage buildings at about 18 per cent of U.S. commercial floorspace but only around 8 per cent of commercial building energy, a mean of 30.2 thousand Btu per square foot — roughly a third of the intensity of a retail store and a quarter of a restaurant's. Within that total, space heating is by far the largest single end use at 39 per cent and lighting is 15 per cent; electricity is about 62 per cent of warehouse energy against gas at 38 per cent, and distribution and shipping centres are about half of all warehouse energy. Benchmarks separate sharply by type: EPA's ENERGY STAR national medians put a distribution centre at 52.9 thousand Btu per square foot against 22.7 for a non-refrigerated warehouse, so what the building does matters more than how big it is. Two further features shape a warehouse's price. Lighting is a large, continuous and controllable load across a very big footprint, and the building usually runs steady hours rather than short trading peaks, which gives it a comparatively high load factor and, other things equal, better supply pricing than a peaky business. That advantage disappears the moment refrigeration, charging or sortation arrives and takes the peak with it.

  • Mean intensity is about 30.2 kBtu per square foot in CBECS 2018.
  • Space heating is 39 per cent of warehouse energy; lighting is 15 per cent.
  • Electricity is roughly 62 per cent, gas 38 per cent.
  • A distribution centre's median intensity is more than double a plain warehouse's.

Cold storage is a different building

Refrigeration rewrites the load. Lawrence Berkeley National Laboratory's analysis of U.S. commercial buildings puts refrigeration at about 35 per cent of warehouse electricity while refrigerated space is only around 8 per cent of warehouse floor area, concentrated in cold stores that then dominate the category. In those facilities refrigeration is commonly half to four-fifths of total electricity, an industry planning range rather than a national statistic, and refrigerated area runs near 17.5 kilowatt-hours per square foot a year. The profile is a high, sustained base load rather than a flat line: compressors, evaporator and condenser fans and controls run around the clock, and demand rises with ambient temperature, door openings, product pull-down and defrost cycles. A cold store normally keeps substantial overnight and weekend demand, which is the opposite of an office, and its billed demand is often set by the coincidence of refrigeration with something else starting up.

  • Refrigeration is about 35 per cent of warehouse electricity nationally.
  • A cold store is commonly 50-80 per cent refrigeration by electricity.
  • Refrigerated area runs near 17.5 kWh per square foot a year.
  • Defrost and ambient-driven peaks set billed demand, not the annual total.

Charging and automation decide the peak, not the base

Once a site adds electric motors, the peak stops being predictable. Refrigeration drives the base; forklift charging and automation determine the incremental peak. Charging load is roughly the number of simultaneously charging units multiplied by each charger's maximum input — model it from the charger rating, not the battery's nominal capacity, because conversion losses add to site consumption. Charging tends to concentrate at shift changes and meal breaks, and a battery-electric fleet therefore adds both annual energy and a sharp coincident demand. Conveyors, sorters and automated storage rise with throughput and cycle hard during wave releases, and high-speed sortation and lifts can spike demand through simultaneous motor starts. There is no reliable national kW-per-square-foot figure for automation, so it has to be built from equipment schedules; if charging overlaps refrigeration at its weather-driven maximum, the resulting peak can push the service entrance, transformer and switchgear beyond what the annual kilowatt-hour figure implies. Load management is therefore a demand decision as much as an energy one: staggering charging, sequencing compressors and keeping defrost out of the charging window lowers the billed peak without touching throughput.

  • Model charging as units charging at once times charger input rating.
  • Expect charging to cluster around shift changes and breaks.
  • Build automation load from equipment schedules, not a rule of thumb.
  • Sequence charging, defrost and start-ups to avoid one coincident peak.

Forklift charging is a facility project, not a socket

Adding chargers is not the same decision as adding sockets. OSHA already treats battery charging as a regulated activity: charging installations must sit in areas designated for that purpose, with facilities for flushing and neutralising spilled electrolyte, for fire protection, for protecting the charging apparatus from damage by trucks, and for adequate ventilation to disperse the fumes batteries give off while gassing. Smoking is prohibited in the area, and open flames, sparks and electric arcs are kept out of it. None of that is an energy purchase, but it decides where the chargers go and what surrounds them. The electrical side is a load calculation rather than a count of trucks: size the addition from the maximum coincident demand of the chargers plus the building's existing load, using each charger's maximum input current rather than its nominal output. Industrial lift-truck chargers commonly run on three-phase 208-480 volt service, and a large lead-acid charger draws on the order of 15 to 25 kW in bulk charge, so a modest fleet can add hundreds of amps at the service. Past the spare capacity behind the switchboard and transformer, the project stops being an electrical job and becomes a utility one.

  • OSHA designates the charging area and its ventilation, wash-down and fire protection.
  • Size chargers from maximum input current, not nominal charging output.
  • A large lead-acid charger draws roughly 15 to 25 kW during bulk charge.
  • Past spare switchboard capacity, it becomes a utility project with a utility clock.

Who holds the meter at a leased site

A warehouse is more often leased than owned, and the lease, not the label on it, decides who can buy the energy. A directly metered suite puts the tenant on the utility's books: the tenant opens the account and can nominate a competitive supplier where retail choice exists. A landlord-held master meter does the opposite. In a master-metered industrial park the utility sees one account, usually the landlord's, and cost is recovered by a pro rata share of rentable area, by private submetering, or by a ratio method that allocates on square footage or hours without measuring anything. A private submeter is a measuring device, not a utility delivery point, so a tenant behind the landlord's master meter normally cannot nominate a supplier for its own space; switching one suite would change the supply arrangement for the whole load. The options move into the lease instead: the landlord can bid the whole master-metered load and pass the result through, the tenant can take a share of a landlord aggregation, or the lease can grant a right to convert to a separate utility meter. Read the utility-account clause, the metering exhibit and the cost-allocation formula before assuming you can shop.

  • Directly metered suite: the tenant is the utility's customer and can nominate a supplier.
  • Master meter: the landlord holds the utility account; a submeter is not a delivery point.
  • Recovery runs by pro rata share, submetering, or a ratio method that measures nothing.
  • Read the utility-account clause, the metering exhibit and the cost-allocation formula.

Gas, and heating a building almost nobody occupies

Warehouse and storage buildings consumed 528 trillion Btu of energy in 2018, of it 325 trillion as electricity and 199 trillion as natural gas, so gas is a real second bill, and in a non-refrigerated warehouse it is almost entirely heating. Space heating is the largest single end use in the category, and the equipment mix reflects it: individual space heaters were the most common heating equipment, present in 22 per cent of warehouse buildings, ahead of packaged heating units at 20 per cent and furnaces at 19 per cent. High-bay space is where the choice is made, because heating an entire tall volume to office temperature is wasteful, so gas-fired infrared radiant-tube and suspended unit heaters warm floors, equipment and people where they are. The load shape follows the weather and the dock doors rather than the calendar: low in summer, concentrated in a handful of cold months, with sharp spikes when a large volume opens to outside air. Gas is bought on a different rulebook, too. On sales service the distributor supplies the molecule; on transportation service a marketer supplies and the distributor delivers, for separate delivery and balancing charges. Eligibility is jurisdiction-specific with no national threshold: National Fuel in Ohio opens competitive supply above 50,000 Ccf a year, and San Diego Gas & Electric treats a meter using about 20,800 therms a month as a noncore transportation customer.

  • Gas was 199 trillion Btu of warehouse energy in 2018, against 325 trillion for electricity.
  • Individual space heaters appear in 22 per cent of warehouse buildings, packaged units in 20, furnaces in 19.
  • Radiant-tube and unit heaters suit a high-bay volume better than heating all the air.
  • Transportation eligibility is jurisdiction-specific: Ohio's National Fuel uses 50,000 Ccf a year as a line.

When the network drops, the building stops

Warehouse operations lose scanning, inventory accuracy, dispatch, label printing and shipping confirmation more or less simultaneously. The consequences are worse than a paused shift: inventories go out of sync, orders are temporarily lost, and recovery work is manual. Utility cost-of-outage research measures a single hour of interruption for a facility of this type in the thousands, and a distribution site processing time-critical orders sits above that. Failover is not a luxury line item in this environment; it is part of the operating design, and it has to be physically independent of the primary path to be worth anything.

  • Identify which systems must survive an outage: scanning, dispatch, telephony.
  • Cellular or a second circuit should be genuinely independent of the first.
  • Test failover deliberately rather than discovering behaviour during an outage.
  • Document the manual fallback procedure for staff alongside the technical one.

Yard, dock and outdoor coverage

The hardest coverage problems at a distribution site are usually outside the building. Trailers in the yard, dock doors that seal a metal box around a handheld terminal, and devices that move between a racked aisle and an open apron all sit at the edge of what an indoor wireless design was built for. Outdoor coverage needs its own survey rather than an extension of the indoor plan, because signal behaves differently over open ground and a device roaming out of the building will try to hold a connection that has already degraded. The questions that settle the design are whether the yard needs coverage at all or only the dock apron, where fixed reading positions can be mounted so they survive weather, wash-down and vehicle contact, and how the network behaves when a parked trailer sits between two access points.

  • Survey the yard separately; outdoor signal is not an extension of indoor coverage.
  • Distinguish continuous coverage from coverage at fixed reading points.
  • Plan for parked trailers and vehicles blocking line of sight.
  • Confirm mountings survive weather, wash-down and vehicle contact.

What a distribution site usually bundles next

A warehouse rarely buys one thing. The energy supply, the primary and backup connectivity, the network that carries scanners and cameras, the hardware on the floor and the security around the operational network are usually decided within a year or two of each other, and treating them separately is how a site ends up with a network that does not support the automation it just bought. HighGround sources connectivity, security, hardware and communications through the AppDirect ecosystem and energy supply through the Broker Online Exchange supplier network, so a site's infrastructure can be compared as one scoped plan. Every request is priced per address, and availability depends on the individual location and its utilities — competitive energy supply turns on the service address, the meter and the utility territory, and municipal utilities, cooperatives and some jurisdictions have no choice at all. Submitting an inquiry places no order and switches no supplier, and HighGround may receive compensation from providers on completed purchases.

  • Bring site addresses, device counts, automation plans and contract dates.
  • Line the network review up ahead of an automation or fleet decision.
  • Availability and terms depend on the location and its utilities.
  • An inquiry opens a comparison, not a commitment.

PUT THE OPTIONS SIDE BY SIDE

Your comparison checklist

Warehouse situationConfirm firstWhat to compare
Scanners dropping in far aislesCoverage survey with racking and stock in placeAccess point design plus roaming behaviour, not circuit speed
Dispatch stops during outagesWhich systems must survive, and for how longIndependent failover circuit or cellular backup
Cold storage or food logisticsRefrigeration share and defrost behaviourDemand impact alongside supply pricing
Forklift fleet going electricCharging schedule and simultaneous charger countLoad profile planning with the utility before installation
Planning automation or roboticsVendor latency, coverage and load requirementsNetwork design sequenced ahead of the automation purchase
Spencer JamesFounder, HighGround Exchange
  • A person reads every request and replies within 24 hours.
  • Sending an inquiry does not place an order or commit you to anything.
  • Availability and terms get confirmed for your locations before anything is decided.

Common questions

Published planning ranges commonly run around 200 Mbps to 1 Gbps where many scanners, cameras, sensors and cloud systems are involved. Coverage and latency usually matter more than the headline number, because a dead spot at the end of an aisle stops work regardless of total capacity.

Steel racking, dense stock and concrete attenuate signal, so a design that works on an empty floor can fail once the building is full. The survey has to be done with racking and inventory in place, and with the mobile equipment and radios that interfere with the design present.

EIA's CBECS 2018 puts warehouse and storage buildings at a mean of about 30.2 thousand Btu per square foot, with space heating the largest end use at 39 per cent and lighting at 15 per cent. Electricity is about 62 per cent of warehouse energy and gas 38 per cent. A distribution centre benchmarks much higher than a plain warehouse: EPA's ENERGY STAR median is roughly 52.9 kBtu per square foot against 22.7 for non-refrigerated warehousing.

Refrigeration is the dominant load. Nationally it is about 35 per cent of warehouse electricity across a floor area that is only around 8 per cent refrigerated, but in a dedicated cold store it commonly runs half to four-fifths of total electricity, an industry planning range rather than a national statistic. Refrigerated area runs near 17.5 kWh per square foot a year, on a high, sustained 24/7 profile.

It adds load that can create a new peak depending on when charging happens. Model it as the number of simultaneously charging units multiplied by each charger's maximum input, and expect charging to cluster at shift changes and breaks. Because refrigeration usually holds the base load, it is the coincidence of charging with refrigeration or sortation that sets the billed peak, so charging schedules and any added capacity should be discussed with the utility before the fleet is delivered.

For most distribution sites, yes. Losing scanning, dispatch and label printing stops the building, and utility research on outage costs measures a single hour of interruption in the thousands. The backup must be physically independent of the primary path to be worth anything, and the failover should be tested rather than assumed.

Yes. Automation vendors specify latency, coverage, roaming and load requirements that a general office network often does not meet, so the connectivity review belongs before the automation specification rather than after it. Sequencing the network first avoids blaming the automation for a connectivity problem.

Usually they need their own positions, even when they join the same network. The requirement is coverage where the devices actually work — the dock apron, the yard lanes, the trailer doors — and that is a different survey from the one that placed access points inside the racking. Test with the site in its normal operating state, with trailers parked, rather than empty.

It depends on who holds the utility account, not on the lease label. If the suite is directly metered and the tenant opens the account, the tenant can nominate a competitive supplier where retail choice exists. If the landlord holds a master meter for the property, the utility sees the landlord's account, a private submeter is not a delivery point, and the tenant usually cannot switch supply for its own space. The routes then are a landlord-bid master load passed through, participation in a landlord aggregation, or a lease right to convert to a separate utility meter at the tenant's cost.

The structure is similar but the rulebook is separate. Electricity choice and gas choice are separate programmes with separate licences, and the distributor's gas tariff defines sales, transportation and interruptible service. Eligibility for transportation, where the customer buys gas from a marketer and the distributor delivers it, is set by the state, the utility and the meter, so a warehouse has to ask its distributor which service class the meter falls in. An electricity supply choice does not imply that the same site can shop gas.

Further reading

Provider and official resources for the relevant service categories. Product availability and terms must be confirmed for your request.

U.S. Energy Information Administration — CBECS 2018: warehouse and storage buildings ↗U.S. Energy Information Administration — CBECS 2018 end-use tables (B8) ↗EPA ENERGY STAR — U.S. national median energy use intensities ↗Lawrence Berkeley National Laboratory — refrigeration in U.S. commercial buildings ↗NIST — Small Business Information Security: The Fundamentals ↗NARUC / utility cost-of-outage research on the economic cost of power interruptions ↗OSHA — Powered industrial trucks, 29 CFR 1910.178 (battery charging) ↗National Fuel (Ohio) — business partners programme overview ↗San Diego Gas & Electric — natural gas service options ↗

KEEP EXPLORING

Connect the next piece.

solution

Compare business internet & connectivity

Compare business fiber, broadband, dedicated internet, wireless backup and multi-location connectivity around the needs of your business.

Explore
solution

SD-WAN & multi-location business networks

Explore SD-WAN and managed network options for multiple locations. Compare policy, connectivity, security and support ownership.

Explore
solution

Backup internet for business continuity

Explore backup internet, wireless failover and secondary connections. Compare coverage, essential workloads and power requirements.

Explore